A2: The general process of pump customization is as follows: 1. Demand communication and program confirmation: Our sales and technical team will communicate with you in detail to understand your customization needs, and then organize relevant technical personnel to conduct a feasibility analysis of the customization project. Based on the analysis results, we will formulate a preliminary customization plan, including the pump's structural design, material selection, performance parameters, and quotation, and communicate with you to confirm the plan.
2. Contract signing: After the customization plan is confirmed by both parties, we will sign a formal customization contract, which clearly stipulates the product specifications, performance parameters, delivery time, quality standards, payment terms, after-sales service, and other contents.
3. Design and review: Our R&D department will carry out detailed design work according to the confirmed customization plan, including the design of the pump's overall structure, impeller, pump casing, seal, and other components, and the selection of materials and accessories. After the design is completed, our company will organize a technical review meeting to review the design scheme from the aspects of technical feasibility, performance reliability, and production process, and modify and optimize the design scheme according to the review results.
4 .Material procurement and processing: After the design scheme is reviewed and approved, our procurement department will purchase the required materials and accessories according to the design requirements, and strictly inspect the quality of the purchased materials and accessories to ensure they meet the design standards. Then, our production workshop will process and manufacture the pump components according to the design drawings, and conduct strict quality control in each processing link.
5. Assembly and testing: After all the components are processed, our assembly workshop will assemble the pump according to the assembly process. After the assembly is completed, the pump will undergo a series of tests, including performance testing (flow rate, head, pressure, power consumption, etc.), tightness testing, vibration testing, noise testing, and reliability testing, to ensure that the pump's performance and quality meet the contract requirements.
6. Delivery and on-site commissioning: After the pump passes all the tests, we will arrange for delivery according to the contract agreement. After the pump arrives at the customer's site, our after-sales technicians will go to the site to conduct on-site installation guidance and commissioning work, and train the customer's operation and maintenance personnel to ensure that the customer can use the pump correctly.
To track the progress of the customization project, you can take the following methods:
1. Designated project manager: After the contract is signed, our company will assign a dedicated project manager to be responsible for the entire customization project. The project manager will communicate with you regularly (usually once a week) to report the progress of the project, including the progress of design, material procurement, processing, assembly, testing, etc., and answer your questions about the project.
2. Online project management platform: Our company has an online project management platform. After the customization project starts, we will open a dedicated account for you. You can log in to the platform at any time to view the real-time progress of the project, including the completion status of each task, the schedule, and the relevant documents (such as design drawings, test reports, etc.).
3. Active communication: If you have any questions about the project progress or need to know the latest situation, you can contact the project manager or our sales team at any time. We will reply to you in a timely manner and provide you with the required information.