Step 1: Raw Materials Control
Material Elements Testing
Inspection of Blank (structure and size)
Step 2: Machining Process Control
First Inspection
Patrol Inspection
Final Inspection
Step 3: Assembly Control (Including the inspections of fit dimension, fasteners, rotation, hydraulic pressure, and etc)
Step 4: Performance Control (Commissioning on Test Center)
Step 5: Warehouse-in Control (Including the inspections of surface, nameplate, packing list and etc)
Step 6: Warehouse-out Control (Including the inspections of package and necessary documents)
Notes:All the manufacturing and quality control steps must be passed with “Quality Trace Table”