Rated duty and water source
Share the required flow and pressure, water-supply information, suction conditions and installation layout. Existing drawings or available water-supply data are a useful starting point.
End suction, split case and vertical turbine pumps. Electric and diesel drive options.
Share the required flow and pressure, water-supply information, suction conditions and installation layout. Existing drawings or available water-supply data are a useful starting point.
Send the destination and required UL/FM, NFPA 20 or local approval criteria. Before ordering, confirm the exact pump model, driver and controller configuration, matching curve, and whether the required supporting documents can be provided.
A single-stage arrangement with axial suction and a separate driver. Review the connections, footprint and service access for the selected unit.
A split-casing, double-suction pump arrangement. Match the selected duty and piping connections with the pump-room layout.
Review the water level, pump setting, column and discharge-head interfaces for the source and installation.
Vertical hollow shaft motor configuration.
Vertical solid shaft motor configuration.
Engine and right-angle transmission arrangement.
Electric: provide the available voltage, frequency and project requirements for the motor and controller.
Diesel: confirm the engine, starting system and installation interfaces, including cooling, fuel and exhaust arrangements.
A pump unit and a complete system have different supply boundaries. Make the quotation explicit.
The custom system shown above illustrates WY's fire-pump system supply work. For a seawater project, review the wetted materials, seals, interfaces and required documents for the proposed configuration.
WY pump manufacturing · machining area
WY's service process covers duty matching, technical comparison and interface coordination before manufacture. Compare the pump, driver and required ancillary equipment as one project scope.
Define the inspection scope and acceptance requirements with the order. Review the required data, photographs and documents against the selected equipment.
Confirm installation guidance, service arrangements and spare-parts identification with the quotation. Provide the equipment details and operating conditions when requesting technical support.
Start with the project information already available:
Ask WY to confirm the matching model, curve, equipment scope and document availability before ordering.
Get a quoteSend the existing pump and driver nameplates, available performance documents, piping dimensions and installation photographs, together with the project's current requirements. Confirm the proposed replacement configuration before ordering.
Confirm the selected equipment, required documents, inspection scope and destination first. Agree the production and shipping schedule and identify which installation or commissioning services are included in the order.