You are here: Home / Service&Support / Cases

Cases

 Key Takeaways from These Cases
1. Remote-first Approach: resolve 60%+ issues without on-site visits.
2. Spare Parts Agility: maintain regional warehouses to minimize delivery delays.
3. Proactive Maintenance: predictive analytics reduced unplanned downtime by 70% in industrial settings.
4. Customer Training: provide end-user training to empower self-sufficiency.
 
These cases demonstrate how structured after-sales processes—combined with technical expertise and digital tools—enable water pump factories to deliver fast, cost-effective, and reliable solutions across industries.
  • Industry: Hospitality
    Issue: A luxury resort in Turkey faced recurring failures in its booster pumps, causing inconsistent water pressure for guests.
    Service Process:1. Diagnosis: Wangyang identified outdated fixed-speed pumps and inadequate pressure control.2. Upgrades:· Replaced pumps with GISO mode
  • Industry: Mining/Phosphate Production
    Issue: A multinational phosphate producer in Indonesia experienced a catastrophic failure of a vertical turbine pump used in ore processing. The pump’s impeller was jammed with wood debris, causing motor burnout.
    Service Process:1.Expedited Logistics: The customer
  • Industry: Oil Refining
    Issue: A UK crude oil refinery struggled with frequent seal failures and high vibrations in non-Wangyang end suction pumps, leading to unplanned shutdowns.
    Service Process: 1. Root Cause Analysis: Wangyang’s service team conducted a vibration analysis and identified misaligned c
  • Total 2 pages  Go to Page
  • Go

Telephone/WhatsApp

+8613912908767

WeChat

17327729166

Quick Links

Product Category

Contact Us

Copyright © 2025 Nanjing Wangyang Pumps Co., Ltd . All Rights Reserved.|SitemapPrivacy Policy